Starting with a nice 1600 Sport we are building a Group 4 car for a customer,
photos will be put on as we progress.
Rear floor removed,turrets and link boxes fitted.
Floor and tunnel removed,we are replacing the whole floor,inner sills and tunnel
Most of the cage constructed,
2 Bars thru to front towers
Centre Floor replaced
The cage is now completed.
Am fitting a new front panel,
making the front guards Bolt On.
The car is leaving shortly to have the Engine/Gbox fitted,
It is now having a Honda S2000 Engine fitted